Cacao pipeline · Batch 01
Uploaded by operator team · 2026-09-22 14:08 · 4.7 MB · geometry parsed, centroids and area computed, state assigned from IBGE boundaries
Parsed properties
One row per KMZ. Area is computed from the polygon, not from the file name. Rows flagged here are carried into Gate 0 as clarification items. Click a row to open it in the handoff view.
| ID | Property | State | Area (ha) | Centroid | Geometry | Note |
|---|
TEAM
Imagery ©2026 Airbus, CNES / Airbus, Maxar
What intake checks
Automatic, before any human review.
Gate 0 · Intake validation›Is the package consistent and usable?›Complete moves to Gate 1 · Clarification needed goes back to the operator and is re-screened
Package checklist by property
Six evidence items per property. A property is complete when every item is present and consistent with the KMZ boundary.
| ID | Property | Boundary | CAR | Registries | Embargo | Photos | Certificates | Outcome |
|---|
Clarification requests
Sent to the operator team. Re-screened on receipt.
Consistency rules
✓CAR polygon overlaps KMZ boundary ≥ 90 %SICAR
✓Matrícula area within ± 10 % of polygon areaCartório
✓No active embargo on the CAR or the CPF/CNPJIBAMA · SEMA
✓Georeferenced photos dated within 12 monthsEXIF
✓Certificates (CCIR, ITR, negative debt) currentINCRA · RFB
Gate 1 · PCV absolute restrictions›Any hit is a hard stop›Pass moves to Gate 2 · Absolute restriction is Do not advance, with reason and evidence recorded
Restriction screen by property
Each class is checked against the polygon, not the centroid. A hit shows the source layer and the overlap it found.
| ID | Property | Human rights | Deforestation cut-off | Protected territories | Outcome | Evidence |
|---|
Absolute restrictions
Rule set: PCV v2 · applied 2026-09-26
×Human rights · employer on the labour "lista suja", or land conflict registeredMTE · CPT
×Deforestation cut-off · any clearing after 2020-12-31 (EUDR) or after 2008-07-22 (Amazon Soy Moratorium)PRODES · MapBiomas
×Protected territories · overlap with conservation unit, indigenous land or quilomboICMBio · FUNAI · INCRA
Restriction class that stopped each property.
Gate 2 · Agroclimatic fit›Cacao · Restore / Bastide criteria›Each indicator scored Optimal · Tolerable · Critical · a binding Critical is Do not advance; a Tolerable with a resolvable cause is Further information
Indicator matrix
Crop model cacao:restore_bastide_v1 · thresholds are the client's and editable under Crop models.
OptimalTolerableCritical
| ID | Property | Precipitation | Dry season | Water deficit | Soil | Depth | Slope | Road access | Outcome |
|---|
Thresholds in force
Restore / Bastide cacao criteria, as loaded. Tolerable bands are where the operator's mitigation (irrigation, shade design) decides.
| Indicator | Optimal | Tolerable | Critical | Source |
|---|---|---|---|---|
| Annual precipitation | 1,500–2,500 mm | 1,250–1,500 · 2,500–3,000 | < 1,250 · > 3,000 | ERA5-Land · CHIRPS |
| Dry-season duration | ≤ 3 months | 3–4.5 months | > 4.5 months | ERA5-Land |
| Water deficit | ≤ 100 mm | 100–200 mm | > 200 mm | Thornthwaite balance |
| Soil class / texture | Latossolo · Argissolo, loam–clay | Neossolo, sandy-loam | Gleissolo · sand | SiBCS · SoilGrids |
| Effective depth | > 100 cm | 60–100 cm | < 60 cm | SoilGrids |
| Slope | < 8 % | 8–20 % | > 20 % | SRTM 30 m |
| Road access | ≤ 25 km paved | 25–60 km | > 60 km | OSM · DNIT |
Batch 01
TEAM
Imagery ©2026 Airbus, CNES / Airbus, Maxar